HMEL Bathinda-Composite works for Part-A (DFCU),Part-B (DFCU),Part-B (HDPE),Part-C (PP) Unit, Part-A (DFCU),Part-B (DFCU) for Guru Govind Singh Refinery
Govt. of Haryana-Pandit Deen Dayal Upadhyay University of Health Sciences (730 bedded hospital along with residential and institutional blocks) at Kutail, Karnal, Haryana
NTPC Gadarwara-Main Plant and Offsite Civil Works Package for Gadarwara STPP Stage-I (2X800 MW)
PMSSY-SMS Medical College of 191 beded at GMC-Jaipur, Rajasthan.
PMSSY-SMS Medical College of 191 beded at GMC-Bhavnagar, Gujarat.
HPCL Vizag-Structural Works, U/G Piping and Misc. Works for Visakh Refinery Modernization Project
Dehradun Smart City Limited-Construction of Smart Road including O and M for 5 years in Uttarakhand.
IRCON International Ltd.-Construction of Station Building,Platforms,Foot Over Bridges across Santragachi Yard with Station Development Work of Santragachi Station.
APJL Power Project, Godda- Civil and Structural work of BTG and BOP Area of Package - A and Permanent Road and Drainage Work for Godda at 2x800 MW power plant.
BPCL Mahul-Civil, Structural and UG Piping work for DHT Integration with New KHT Unit Project.
NSPCL Rourkela-Civil and mechanical work for Boiler, Main plant package, CHP and AHP package and all allied civil works at 1 X 250 MW Rourkela PP-II Expansion of NTPC - SAIL Power Company Pvt. Ltd. For BHEL
NTPC Ramagundam-Boiler,CHP and AHP Structure for 2 X 800 MW Power Project for BHEL.
Kolkata Municipal Corporation-Renewing of 9.0 MG Capacity Century Old Over Head Balancing Steel Reservoir (Tallah Tank) under AMRUT and 3rd Party Stage wise inspection job and Non-destructive Testing for Construction of Foot Over Bridge with Escalators in front of Alipur Zoo
Penal Institution,Govt. of West Bengal-Construction of New Correctional Home at Baruipur under Phase-II at Baruipur, in the District of South 24 Parganas, West Bengal
Durgapur Barrage-Rehabilitation and Strengthening of damage divide walls and downstream floor of over River Damodar at Block and PS - Barjora, Dist. Bankura, WB
HPCL Dharmapuri-Tankage work at Dharmapuri of VDPL Project and Transportation of Steel Plates and Pipes from DS (08) Pipeline Dump Site, Kariyamangalam to Dharmapuri Terminal.
RINL Vizag-Civil Engineering Work pertaining to BOF-3 and Caster-4 Area and associated facilities in SMS-2 Complex in Visakhapatnam Steel Plant
Adani Dhamra Port-Construction of Boundary Wall, Civil work for General Building and Foundations (Area - 2) and Unit 300 for DLTPL Dhamra LNG Project